Inspection Engine™
ArchitectGeneral contractorSupplier
Demo
PlatformBIM Engine for architectsMaterial Engine™Specify real products, hand off a clean schedule.Reconstruction Engine™Turn a site scan into measurable as-built geometry.Inspection Engine™Document existing conditions as a report you can issue.Material catalogBrowse real products by brand and origin, order samples.
PlatformBIM Engine for general contractorsMaterial Engine™Send RFQs from the schedule, track every delivery.Inspection Engine™Walk the site, send the report the same day.Reconstruction Engine™Verify installed work against the design geometry.Material catalogCheck stock and lead time before the RFQ goes out.
PlatformBIM Engine for suppliersMaterial Engine™Receive RFQs from teams sourcing, quote on the spot.Become a supplier partnerList your catalog and win pre-qualified RFQs.
Demo

BIM Engine for

  • Architect
  • General contractor
  • Supplier

Marketplace

  • Material catalog

Company

  • Media kit
  • Contact

Legal

  • Privacy
  • Terms
  • Security

Socials

Ask about BIM Engine:

We handle your site walks.

Save hours on documentation with AI that captures, organizes, and formats every detail for you.

Features

What it does

Drop the walk in

Photos from the site walk land in one report.

May 11 site walk

96 photos

Apr 27 punch walk

64 photos

Click or drag
Folders here

Locations

Ground floor
Level 2
May 18 site walk
Architect

Photos to findings

Every photo becomes a written, located finding.

PhotosDescription
Architect
Inspection Engine™

Ceiling opening exposes wood framing above. Patch edges before insulation resumes.

Architect
Inspection Engine™

One length of exposed conduit runs below the taped ceiling joint.

Inspection Engine™

Shower pan waterproofing stops short of the curb. Extend the membrane before tile.

Switch languages

The same report, rewritten for every reader.

Inspection Engine™

Ceiling opening exposes wood framing above. Patch edges before insulation resumes.

Ceiling opening exposes wood framing above. Patch edges before insulation resumes.

Architect

One report, every role

Architect and contractor work on the same report, in one platform.

May 18 site walk

DraftIssuedIssue
Architect
1Contractor