


Walk the site with a camera. Punch items and reports draft themselves.


Features
The site walk arrives as photos, not a phone call.
May 11 site walk
96 photos




Apr 27 punch walk
64 photos
Click or drag
Folders here
Locations
Each item written, located, and assignable.

Ceiling opening exposes wood framing above. Patch edges before insulation resumes.

One length of exposed conduit runs below the taped ceiling joint.

Shower pan waterproofing stops short of the curb. Extend the membrane before tile.
Print, PDF, or a link filed against the project.
May 18 site walk