Material Engine™
ArchitectGeneral contractorSupplier
ArchitectGeneral contractorSupplier

BIM Engine for

  • Architect
  • General contractor
  • Supplier

Company

  • Media kit
  • Contact

Legal

  • Privacy
  • Terms
  • Security

Socials

Ask about BIM Engine:

Cause of extinction: legacy SaaS
Still saving v_final_FINAL(2) when the asteroid hit
Emailed the spec as a PDF. Nobody opened it for 66m years

Procurement without the phone tag. RFQ to jobsite.

Send RFQs from the schedule, compare quotes, award, and track every delivery.

Features

What it does

One package, clearly structured

Every line item, supplier, status, and quantity organized in one view.

Needs a supplier

3
ProductSupplierStatusQty
Water heaterAtlas SupplyPick a supplier1 EA
Exit signField SupplyPick a supplier1 EA
Terrazzo tileAtlas TilePick a supplier180 SF

Waiting on others

4
ProductSupplierStatusQty
Poly sheetingBuild SupplyAwaiting quotes10 EA
Safety glassClearViewAwaiting quotes1 EA
Acoustic tileCeiling CoAwaiting quotes620 SF
Steel windowMetro SteelAwaiting quotes12 EA

On the way & delivered

3
ProductSupplierStatusQty
Stone panelStone CoShipped48 EA
Metal panelMetro SteelDelivered36 EA
Felt tileAtlas TileDelivered410 SF

Needs a supplier

3
ProductSupplierStatusQty
Water heaterAtlas SupplyPick a supplier1 EA
Exit signField SupplyPick a supplier1 EA
Terrazzo tileAtlas TilePick a supplier180 SF

Waiting on others

4
ProductSupplierStatusQty
Poly sheetingBuild SupplyAwaiting quotes10 EA
Safety glassClearViewAwaiting quotes1 EA
Acoustic tileCeiling CoAwaiting quotes620 SF
Steel windowMetro SteelAwaiting quotes12 EA

On the way & delivered

3
ProductSupplierStatusQty
Stone panelStone CoShipped48 EA
Metal panelMetro SteelDelivered36 EA
Felt tileAtlas TileDelivered410 SF
Contractor

Compare, then award

Optimize the product mix for cost, speed, or simplicity.

Level 2 floor finishes

Porcelain tile · grout · edge trim · 1,840 SF

3 proposals
Nord clay tileAtlas Tile$8,86912 days
Standard groutAtlas Tile$1,10410 days
Alloy edge trimMetro Steel$1,4369 days
Contractor

Talk to the supplier

Reach the rep behind each quote, on the project.

Lena Richardson · Cascadia FlooringHotel lobby · Level 2 finishesRepliedAwaiting reply
Honed limestone ships in 3 weeks.Lena · 9:14 AM
Hold that lead time to award?You · 9:15 AM
Held through award. Sample due Thursday.Lena · 9:16 AM
Hold that lead time to award?SendContractor

Follow every order

Purchase orders tracked to the jobsite gate.

© OpenFreeMap · © OpenMapTiles · © OpenStreetMap
Ready at the supplierPicks up Aug 19
Inbound to jobsiteArrives Aug 21
At the jobsite gateSigned Aug 21
TypeStatusShipped
OrderScheduledOn the wayDelivered-Aug 19, 2026Aug 19, 2026

Before and after

One package, carried all the way.

Before: threads and spreadsheets

47

Gmail

Mail

RE: RE: FW: Flooring quote requestMon
Updated pricing v3 FINAL.xlsxMon
Which spreadsheet is current?Tue
RE: RE: RE: Flooring quote requestWed

Viracon quote.pdf

3 pages

Flooring RFQ v3.docx

Edited Tue

quotes_v3_FINAL(2).xlsx

VendorTotalNote
Vendor A$48,200ex. tax?
Vendor B$51,900v2 only
Vendor C#REF!resend

After: one shared material record

Level 2 finishes

42 items · shared live record

Shared record

Oak plank 05 · Natural

09 64 29 · Wood flooring

4,200 SF

Architect

Specifiedproduct

Oak plank 05 · Natural

Contractor

Awardedpackage

$51,600 · freight included

Supplier

Confirmeddelivery

Jobsite · Aug 19