


Site visit in, report out. Capture photos in the field. The engine drafts the report before you are back.


Features
Photos from the site walk land in one report.
May 11 site walk
96 photos




Apr 27 punch walk
64 photos
Click or drag
Folders here
Locations
Every photo becomes a written, located finding.

Ceiling opening exposes wood framing above. Patch edges before insulation resumes.

One length of exposed conduit runs below the taped ceiling joint.

Shower pan waterproofing stops short of the curb. Extend the membrane before tile.
The same report, rewritten for every reader: English, French, Spanish, German, Chinese.
Ceiling opening exposes wood framing above. Patch edges before insulation resumes.
Ceiling opening exposes wood framing above. Patch edges before insulation resumes.
Architect and contractor work on the same report, in one platform.
May 18 site walk