Newsroom
ArchitectGeneral contractorSupplier
Demo
PlatformBIM Engine for architectsMaterial Engine™Specify real products, hand off a clean schedule.Reconstruction Engine™Turn a site scan into measurable as-built geometry.Inspection Engine™Document existing conditions as a report you can issue.Material catalogBrowse real products by brand and origin, order samples.
PlatformBIM Engine for general contractorsMaterial Engine™Send RFQs from the schedule, track every delivery.Inspection Engine™Walk the site, send the report the same day.Reconstruction Engine™Verify installed work against the design geometry.Material catalogCheck stock and lead time before the RFQ goes out.
PlatformBIM Engine for suppliersMaterial Engine™Receive RFQs from teams sourcing, quote on the spot.Become a supplier partnerList your catalog and win pre-qualified RFQs.
Demo

BIM Engine for

  • Architect
  • General contractor
  • Supplier

Marketplace

  • Material catalog

Company

  • Newsroom
  • Media kit
  • Contact

Legal

  • Privacy
  • Terms
  • Security

Socials

Ask about BIM Engine:

← Newsroom

Material Engine: from award to collected cash on one PO

BIM Engine TeamSeptember 23, 2026·3 min read
Share
  • The invoice your rep already retyped
  • The supplier bills the PO, not a blank form
  • The general contractor pays the schedule they awarded
  • Cash collection rides Stripe Connect on the order
  • The job ledger reads the same spine
  • What is live and what is next

The invoice your rep already retyped

Today a distributor wins a package on a general contractor's email thread, ships against a PO number in a spreadsheet, and rebuilds the same lines in QuickBooks to send an invoice. Net terms on the PDF do not match what the estimator thought they awarded. A release ships while accounts receivable still shows the deposit open, and the follow-up is a thread that starts with "checking on payment for invoice 1042."

Material Engine keeps the award, the purchase order, each release, the invoice, and the payment on one procurement record, so the supplier bills what was specified and shipped, and the general contractor pays against the schedule they saw at award.

Award, purchase order, release, invoice, and payment on one record.

The supplier bills the PO, not a blank form

After award the purchase order carries the quoted subtotal, tax, payment schedule, and cap. When the supplier ships a release they open the invoice from that PO: release lines and amounts prefilled, sales tax consistent with how the quote was computed, and a total that cannot exceed what remains on the order. Structured payment terms from the quote (deposit, balance on delivery, milestone rows) become due dates on the invoice instead of a net-30 typed from memory.

Ready at the supplierPicks up Aug 19
Inbound to jobsiteArrives Aug 21
At the jobsite gateSigned Aug 21
TypeStatusShipped
OrderScheduledOn the wayDelivered-Aug 19, 2026Aug 19, 2026
The supplier's release on the road, with the jobsite instructions the PO already carries.·BIM Engine

The general contractor pays the schedule they awarded

The contractor's payment screen reads the same PO the supplier invoiced. Deposits and balance tranches match the quote's schedule, not a surprise rewrite at pay time. When a delivered PO still has an open invoice and a remaining balance, the buyer gets a balance-due notice tied to that order so accounts payable can close the tranche without a side email hunt.

Cash collection rides Stripe Connect on the order

Buyer firms pay through the platform against the invoice; supplier firms receive payout through Stripe Connect linked to the firm that quoted and shipped. That is the construction invoice-to-cash loop for platform trades today: invoice raised from the PO, buyer settlement on the PO, supplier payout on Connect. Marketplace listing remains free while mass marketplace payouts roll out in a later wave, as described in our building materials marketplace post.

The job ledger reads the same spine

Project Books (available on develop and preview while export and categorization are reviewed for production) is the downstream books layer on procurement: job cost and accounts-payable categories derived from award and PO events, then payments, rather than a parallel spreadsheet. The general contractor sees committed versus actual on the project; accountants can export toward QuickBooks or Sage-friendly journals without re-keying the PO spine.

What is live and what is next

Live on Material Engine today for participating firms: RFQ through award, issued PO, release shipment, PO-grounded supplier invoice, buyer payment against schedule, and Connect payout when the buyer pays. In active development or gated to develop and preview: Project Books close views, spend ask, and accountant export polish. On the roadmap: broader marketplace settlement, early-pay options at invoice time, and deeper automation for follow-ups beyond delivery-triggered balance notices.

The procurement story through quote and delivery is in Material Engine: construction procurement on one record. Distributors listing into California can start at suppliers.

Material Engine